Led failure analysis, design-options assessment, detailed design, and implementation of a telescopic chute upgrade for coal shiploading operations. Authored and published a technical paper on the upgrade of HPCT SL2 telescopic chute using newly introduced LDX 2101 duplex stainless steel, a solution developed through to manufacture and commissioning. The adopted design increased the operational life of the chute assembly by 50%

Leave a Reply

Your email address will not be published. Required fields are marked *